HOME | DD

KaneTakerfan701 — A Shocking Surprise

Published: 2019-08-24 21:03:16 +0000 UTC; Views: 3075; Favourites: 33; Downloads: 0
Redirect to original
Description Rebecca is in a private workshop with Lady who is being cleaned up. She's currently in preparation for her heavy intermediate repairs which would take around six or nine months to complete. While she settles in, Rebecca sees Bear shunting in an old and rusty engine's tender shaped similar to Gordon's. She asks Bear what's going on. He tells her that an old friend is being restored for a return to Sodor... and that engine is me. Rebecca is surprised by this and looks forward to seeing me when I wake up soon for she's heard little about who I am and never got the chance to see me when I was in steam. At this stage in my overhaul my boiler was removed for a new one along with new side rods, forward front wheels and new cab parts. 

Models and Routes - SI3D, Kellsthorpe Works, WildNorWestter, tidmouthworks, Sodor Workshops, Cog Railway 3d, Download Station and Trainz
Related content
Comments: 3

JasonSembrano2000 [2019-08-25 12:51:36 +0000 UTC]

Metro: Probably the same thing for the Big Boy 4014, sir. But the problem is, it only took three years to restore 4014. How long till your restoration is completed?
(By the way, I'm making up a new parody story for BWG4LIFE. He's just in inspiration for those spongy stories. And I think this'll be my last.)

👍: 0 ⏩: 1

KaneTakerfan701 In reply to JasonSembrano2000 [2019-08-26 14:40:47 +0000 UTC]

I see. If I were to guess perhaps a a few years shorter since most of me was good condition

👍: 0 ⏩: 1

JasonSembrano2000 In reply to KaneTakerfan701 [2019-08-26 14:42:58 +0000 UTC]

Okay. Good luck.

👍: 0 ⏩: 0