HOME | DD

MisterPSYCHOPATH3001 — Riverdale and Western signal upgrades

Published: 2019-11-07 03:19:35 +0000 UTC; Views: 613; Favourites: 6; Downloads: 4
Redirect to original
Description

The Riverdale and Western Railroad has recently upgraded their signalling systems for the new double track main line stretching between Riverdale Yard and Harmony Yard.


M interlocking is the south end and HS interlocking the north end of the double track main.

--------------------------------------------------------------------------------

The signal mast at M interlocking has the three heads labeled:


The top head is for the main line. (HS Main)

The middle head is for the Fort Boeningham spur. (FTB Spur)

The bottom head is for the chemical plant spur. (SRN Spur) (Smoran Chemicals)

------------------------------------------------------------------------------------

The signal mast at HS interlocking only has one head for the main line. (RD Main)

------------------------------------------------------------------------------------

The APP signal and two aspect signal protects the diamond crossing where the R&W intersects with the former Oreconsin Central Route Railroad, now owned by the Pondera and Northwestern Railroad. (PNWR)

---------------------------------------------------------------------------------------------------------

The yard entrance signals are for the trains coming into the yard from the main line.

Related content
Comments: 0