HOME | DD

Spacetelescope — Hubble Space Telescope (HST)

Published: 2024-04-25 14:10:29 +0000 UTC; Views: 7276; Favourites: 12; Downloads: 0
Redirect to original
Description The Hubble Space Telescope (referred to as HST or Hubble) is a space telescope that was launched into low Earth orbit in 1990 and remains in operation. It was not the first space telescope, but it is one of the largest and most versatile, renowned as a vital research tool and as a public relations boon for astronomy. The Hubble telescope is named after astronomer Edwin Hubble and is one of NASA's Great Observatories. The Space Telescope Science Institute STScI) selects Hubble's targets and processes the resulting data, while the Goddard Space Flight Center (GSFC) controls the spacecraft.

Hubble features a 2.4 m (7 ft 10 in) mirror, and its five main instruments observe in the ultraviolet, visible, and near-infrared regions of the electromagnetic spectrum. Hubble's orbit outside the distortion of Earth's atmosphere allows it to capture extremely high-resolution images with substantially lower background light than ground-based telescopes. It has recorded some of the most detailed visible light images, allowing a deep view into space. Many Hubble observations have led to breakthroughs in astrophysics, such as determining the rate of expansion of the universe.

Space telescopes were proposed as early as 1923, and the Hubble telescope was funded and built in the 1970s by the United States space agency NASA with contributions from the European Space Agency. Its intended launch was in 1983, but the project was beset by technical delays, budget problems, and the 1986 Challenger disaster. Hubble was finally launched in 1990, but its main mirror had been ground incorrectly, resulting in spherical aberration that compromised the telescope's capabilities. The optics were corrected to their intended quality by a servicing mission in 1993.

Hubble is the only telescope designed to be maintained in space by astronauts. Five Space Shuttle missions have repaired, upgraded, and replaced systems on the telescope, including all five of the main instruments. The fifth mission was initially canceled on safety grounds following the Columbia disaster, but after NASA administrator Michael D. Griffin approved it, the servicing mission was completed in 2009. Hubble completed 30 years of operation in April 2020 and is predicted to last until 2030–2040.



Conception, design and aim

Proposals and precursors

In 1923, Hermann Oberth—considered a father of modern rocketry, along with Robert H. Goddard and Konstantin Tsiolkovsky—published Die Rakete zu den Planetenräumen ("The Rocket into Planetary Space"), which mentioned how a telescope could be propelled into Earth orbit by a rocket.

The history of the Hubble Space Telescope can be traced to 1946, to astronomer Lyman Spitzer's paper "Astronomical advantages of an extraterrestrial observatory". In it, he discussed the two main advantages that a space-based observatory would have over ground-based telescopes. First, the angular resolution would be limited only by diffraction, rather than by the turbulence in the atmosphere, which causes stars to twinkle, known to astronomers as seeing. At that time ground-based telescopes were limited to resolutions of 0.5–1.0 arcseconds, compared to a theoretical diffraction-limited resolution of about 0.05 arcsec for an optical telescope with a mirror 2.5 m (8 ft 2 in) in diameter. Second, a space-based telescope could observe infrared and ultraviolet light, which are strongly absorbed by the atmosphere of Earth.
Spitzer devoted much of his career to pushing for the development of a space telescope. In 1962, a report by the U.S. National Academy of Sciences recommended development of a space telescope as part of the space program, and in 1965, Spitzer was appointed as head of a committee given the task of defining scientific objectives for a large space telescope.

Also crucial was the work of Nancy Grace Roman, the "Mother of Hubble". Well before it became an official NASA project, she gave public lectures touting the scientific value of the telescope. After it was approved, she became the program scientist, setting up the steering committee in charge of making astronomer needs feasible to implement and writing testimony to Congress throughout the 1970s to advocate continued funding of the telescope. Her work as project scientist helped set the standards for NASA's operation of large scientific projects.

Space-based astronomy had begun on a very small scale following World War II, as scientists made use of developments that had taken place in rocket technology. The first ultraviolet spectrum of the Sun was obtained in 1946, and NASA launched the Orbiting Solar Observatory (OSO) to obtain UV, X-ray, and gamma-ray spectra in 1962. An orbiting solar telescope was launched in 1962 by the United Kingdom as part of the Ariel programme, and in 1966 NASA launched the first Orbiting Astronomical Observatory (OAO) mission. OAO-1's battery failed after three days, terminating the mission. It was followed by Orbiting Astronomical Observatory 2 (OAO-2), which carried out ultraviolet observations of stars and galaxies from its launch in 1968 until 1972, well beyond its original planned lifetime of one year. The OSO and OAO missions demonstrated the important role space-based observations could play in astronomy. In 1968, NASA developed firm plans for a space-based reflecting telescope with a mirror 3 m (9.8 ft) in diameter, known provisionally as the Large Orbiting Telescope or Large Space Telescope (LST), with a launch slated for 1979. These plans emphasized the need for crewed maintenance missions to the telescope to ensure such a costly program had a lengthy working life, and the concurrent development of plans for the reusable Space Shuttle indicated that the technology to allow this was soon to become available.


Quest for funding

The continuing success of the OAO program encouraged increasingly strong consensus within the astronomical community that the LST should be a major goal. In 1970, NASA established two committees, one to plan the engineering side of the space telescope project, and the other to determine the scientific goals of the mission. Once these had been established, the next hurdle for NASA was to obtain funding for the instrument, which would be far more costly than any Earth-based telescope. The U.S. Congress questioned many aspects of the proposed budget for the telescope and forced cuts in the budget for the planning stages, which at the time consisted of very detailed studies of potential instruments and hardware for the telescope. In 1974, public spending cuts led to Congress deleting all funding for the telescope project.

In 1977, then NASA Administrator James C. Fletcher proposed a token $5 million for Hubble in NASA's budget. Then NASA Associate Administrator for Space Science, Noel Hinners, instead cut all funding for Hubble, gambling that this would galvanize the scientific community into fighting for full funding. As Hinners recalls:


It was clear that year that we weren't going to be able to get a full-up start. There was some opposition on [Capitol] Hill to getting a new start on [Hubble]. It was driven, in large part as I recall, by the budget situation. Jim Fletcher proposed that we put in $5 million as a placeholder. I didn't like that idea. It was, in today's vernacular, a "sop" to the astronomy community. "There's something in there, so all is well".

I figured in my own little head that to get that community energized we'd be better off zeroing it out. Then they would say, "Whoa, we're in deep trouble", and it would marshal the troops. So I advocated that we not put anything in. I don't remember any of the detailed discussions or whether there were any, but Jim went along with that so we zeroed it out. It had, from my perspective, the desired impact of stimulating the astronomy community to renew their efforts on the lobbying front. While I like to think in hindsight it was a brilliant political move, I'm not sure I thought it through all that well. It was something that was spur of the moment.

[...] $5 million would let them think that all is well anyway, but it's not. So let's give them a message. My own thinking, get them stimulated to get into action. Zeroing it out would certainly give that message. I think it was as simple as that. Didn't talk to anybody else about doing it first, just, "Let's go do that". Voila, it worked. Don't know whether I'd do that again.


The political ploy worked. In response to Hubble being zeroed out of NASA's budget, a nationwide lobbying effort was coordinated among astronomers. Many astronomers met congressmen and senators in person, and large-scale letter-writing campaigns were organized. The National Academy of Sciences published a report emphasizing the need for a space telescope, and eventually, the Senate agreed to half the budget that had originally been approved by Congress.

The funding issues led to a reduction in the scale of the project, with the proposed mirror diameter reduced from 3 m to 2.4 m, both to cut costs and to allow a more compact and effective configuration for the telescope hardware. A proposed precursor 1.5 m (4 ft 11 in) space telescope to test the systems to be used on the main satellite was dropped, and budgetary concerns also prompted collaboration with the European Space Agency (ESA). ESA agreed to provide funding and supply one of the first generation instruments for the telescope, as well as the solar cells that would power it, and staff to work on the telescope in the United States, in return for European astronomers being guaranteed at least 15% of the observing time on the telescope. Congress eventually approved funding of US$36 million for 1978, and the design of the LST began in earnest, aiming for a launch date of 1983. In 1983, the telescope was named after Edwin Hubble, who confirmed one of the greatest scientific discoveries of the 20th century, made by Georges Lemaître, that the universe is expanding.


Construction and engineering

Once the Space Telescope project had been given the go-ahead, work on the program was divided among many institutions. Marshall Space Flight Center (MSFC) was given responsibility for the design, development, and construction of the telescope, while Goddard Space Flight Center was given overall control of the scientific instruments and ground-control center for the mission. MSFC commissioned the optics company Perkin-Elmer to design and build the optical tube assembly (OTA) and Fine Guidance Sensors for the space telescope. Lockheed was commissioned to construct and integrate the spacecraft in which the telescope would be housed.


Optical tube assembly

Optically, the HST is a Cassegrain reflector of Ritchey–Chrétien design, as are most large professional telescopes. This design, with two hyperbolic mirrors, is known for good imaging performance over a wide field of view, with the disadvantage that the mirrors have shapes that are hard to fabricate and test. The mirror and optical systems of the telescope determine the final performance, and they were designed to exacting specifications. Optical telescopes typically have mirrors polished to an accuracy of about a tenth of the wavelength of visible light, but the Space Telescope was to be used for observations from the visible through the ultraviolet and was specified to be diffraction limited to take full advantage of the space environment. Therefore, its mirror needed to be polished to an accuracy of 10 nanometers, or about 1/65 of the wavelength of red light. On the long wavelength end, the OTA was not designed with optimum infrared performance in mind—for example, the mirrors are kept at stable (and warm, about 15 °C) temperatures by heaters. This limits Hubble's performance as an infrared telescope.

Perkin-Elmer (PE) intended to use custom-built and extremely sophisticated computer-controlled polishing machines to grind the mirror to the required shape. However, in case their cutting-edge technology ran into difficulties, NASA demanded that PE sub-contract to Kodak to construct a back-up mirror using traditional mirror-polishing techniques. (The team of Kodak and Itek also bid on the original mirror polishing work. Their bid called for the two companies to double-check each other's work, which would have almost certainly caught the polishing error that later caused problems.) The Kodak mirror is now on permanent display at the National Air and Space Museum. An Itek mirror built as part of the effort is now used in the 2.4 m telescope at the Magdalena Ridge Observatory.

Construction of the Perkin-Elmer mirror began in 1979, starting with a blank manufactured by Corning from their ultra-low expansion glass. To keep the mirror's weight to a minimum it consisted of top and bottom plates, each 25 mm (0.98 in) thick, sandwiching a honycomb lattice. Perkin-Elmer simulated microgravity by supporting the mirror from the back with 130 rods that exerted varying amounts of force. This ensured the mirror's final shape would be correct and to specification when deployed. Mirror polishing continued until May 1981. NASA reports at the time questioned Perkin-Elmer's managerial structure, and the polishing began to slip behind schedule and over budget. To save money, NASA halted work on the back-up mirror and moved the launch date of the telescope to October 1984. The mirror was completed by the end of 1981; it was washed using 9,100 L (2,000 imp gal; 2,400 US gal) of hot, deionized water and then received a reflective coating of 65 nm-thick aluminum and a protective coating of 25 nm-thick magnesium fluoride.

Doubts continued to be expressed about Perkin-Elmer's competence on a project of this importance, as their budget and timescale for producing the rest of the OTA continued to inflate. In response to a schedule described as "unsettled and changing daily", NASA postponed the launch date of the telescope until April 1985. Perkin-Elmer's schedules continued to slip at a rate of about one month per quarter, and at times delays reached one day for each day of work. NASA was forced to postpone the launch date until March and then September 1986. By this time, the total project budget had risen to US$1.175 billion.


Spacecraft systems

The spacecraft in which the telescope and instruments were to be housed was another major engineering challenge. It would have to withstand frequent passages from direct sunlight into the darkness of Earth's shadow which would cause major changes in temperature, while being stable enough to allow extremely accurate pointing of the telescope. A shroud of multi-layer insulation keeps the temperature within the telescope stable and surrounds a light aluminum shell in which the telescope and instruments sit. Within the shell, a graphite-epoxy frame keeps the working parts of the telescope firmly aligned. Because graphite composites are hygroscopic, there was a risk that water vapor absorbed by the truss while in Lockheed's clean room would later be expressed in the vacuum of space; resulting in the telescope's instruments being covered by ice. To reduce that risk, a nitrogen gas purge was performed before launching the telescope into space.

While construction of the spacecraft in which the telescope and instruments would be housed proceeded somewhat more smoothly than the construction of the OTA, Lockheed experienced some budget and schedule slippage, and by the summer of 1985, construction of the spacecraft was 30% over budget and three months behind schedule. An MSFC report said Lockheed tended to rely on NASA directions rather than take their own initiative in the construction.


Computer systems and data processing

The two initial, primary computers on the HST were the 1.25 MHz DF-224 system, built by Rockwell Autonetics, which contained three redundant CPUs, and two redundant NSSC-1(NASA Standard Spacecraft Computer, Model 1) systems, developed by Westinghouse and GSFC using diode–transistor logic (DTL). A co-processor for the DF-224 was added during Servicing Mission 1 in 1993, which consisted of two redundant strings of an Intel-based 80386 processor with an 80387 math co-processor. The DF-224 and its 386 co-processor were replaced by a 25 MHz Intel-based 80486 processor system during Servicing Mission 3A in 1999. The new computer is 20 times faster, with six times more memory, than the DF-224 it replaced. It increases throughput by moving some computing tasks from the ground to the spacecraft and saves money by allowing the use of modern programming languages.

Additionally, some of the science instruments and components had their own embedded microprocessor-based control systems. The MATs (Multiple Access Transponder) components, MAT-1 and MAT-2, use Hughes Aircraft CDP1802CD microprocessors. The Wide Field and Planetary Camera (WFPC) also used an RCA 1802 microprocessor (or possibly the older 1801 version). The WFPC-1 was replaced by the WFPC-2 during Servicing Mission 1 in 1993, which was then replaced by the Wide Field Camera 3 (WFC3) during Servicing Mission 4 in 2009. The upgrade extended Hubble's capability of seeing deeper into the universe and providing images in three broad regions of the spectrum.


Initial instruments

When launched, the HST carried five scientific instruments: the Wide Field and Planetary Camera (WF/PC), Goddard High Resolution Spectrograph (GHRS), High Speed Photometer (HSP), Faint Object Camera (FOC) and the Faint Object Spectrograph (FOS). WF/PC used a radial instrument bay, and the other four instruments were each installed in an axial instrument bay.

WF/PC was a high-resolution imaging device primarily intended for optical observations. It was built by NASA's Jet Propulsion Laboratory, and incorporated a set of 48 filters isolating spectral lines of particular astrophysical interest. The instrument contained eight charge-coupled device (CCD) chips divided between two cameras, each using four CCDs. Each CCD has a resolution of 0.64 megapixels. The wide field camera (WFC) covered a large angular field at the expense of resolution, while the planetary camera (PC) took images at a longer effective focal length than the WF chips, giving it a greater magnification.

The Goddard High Resolution Spectrograph (GHRS) was a spectrographdesigned to operate in the ultraviolet. It was built by the Goddard Space Flight Center and could achieve a spectral resolution of 90,000. Also optimized for ultraviolet observations were the FOC and FOS, which were capable of the highest spatial resolution of any instruments on Hubble. Rather than CCDs, these three instruments used photon-counting digicons as their detectors. The FOC was constructed by ESA, while the University of California, San Diego, and Martin Marietta Corporation built the FOS.

The final instrument was the HSP, designed and built at the University of Wisconsin–Madison. It was optimized for visible and ultraviolet light observations of variable stars and other astronomical objects varying in brightness. It could take up to 100,000 measurements per second with a photometric accuracy of about 2% or better.

HST's guidance system can also be used as a scientific instrument. Its three Fine Guidance Sensors (FGS) are primarily used to keep the telescope accurately pointed during an observation, but can also be used to carry out extremely accurate astrometry; measurements accurate to within 0.0003 arcseconds have been achieved.


Ground support

The Space Telescope Science Institute (STScI) is responsible for the scientific operation of the telescope and the delivery of data products to astronomers. STScI is operated by the Association of Universities for Research in Astronomy and is physically located in Baltimore Maryland on the Homewood campus of Johns Hopkins University, one of the 39 U.S. universities and seven international affiliates that make up the AURA consortium. STScI was established in 1981 after something of a power struggle between NASA and the scientific community at large. NASA had wanted to keep this function in-house, but scientists wanted it to be based in an academic establishment.The Space Telescope European Coordinating Facility, established at Garching bei München near Munich in 1984, provided similar support for European astronomers until 2011, when these activities were moved to the European Space Astronomy Centre. 


One complex task that falls to STScI is scheduling observations for the telescope. Hubble is in a low-Earth orbit to enable servicing missions, which results in most astronomical targets being occulted by the Earth for slightly less than half of each orbit. Observations cannot take place when the telescope passes through the South Atlantic Anomaly due to elevated radiation levels, and there are also sizable exclusion zones around the Sun (precluding observations of Mercury), Moon and Earth. The solar avoidance angle is about 50°, to keep sunlight from illuminating any part of the OTA. Earth and Moon avoidance keeps bright light out of the FGSs, and keeps scattered light from entering the instruments. If the FGSs are turned off, the Moon and Earth can be observed. Earth observations were used very early in the program to generate flat-fields for the WFPC1 instrument. There is a so-called continuous viewing zone (CVZ), within roughly 24° of Hubble's orbital poles, in which targets are not occulted for long periods.

Due to the precession of the orbit, the location of the CVZ moves slowly over a period of eight weeks. Because the limb of the Earth is always within about 30° of regions within the CVZ, the brightness of scattered earthshine may be elevated for long periods during CVZ observations. Hubble orbits in low Earth orbit at an altitude of approximately 540 kilometers and an inclination of 28.5°. The position along its orbit changes over time in a way that is not accurately predictable. The density of the upper atmosphere varies according to many factors, and this means Hubble's predicted position for six weeks' time could be in error by up to 4,000 km. Observation schedules are typically finalized only a few days in advance, as a longer lead time would mean there was a chance the target would be unobservable by the time it was due to be observed. Engineering support for HST is provided by NASA and contractor personnel at the Goddard Space Flight Center in Greenbelt, Maryland, 48 km south of the STScI. Hubble's operation is monitored 24 hours per day by four teams of flight controllers who make up Hubble's Flight Operations Team.


Challenger disaster, delays, and eventual launch

By January 1986, the planned launch date for Hubble that October looked feasible, but the Challenger disaster brought the U.S. space program to a halt, grounded the Shuttle fleet, and forced the launch to be postponed for several years. During this delay the telescope was kept in a clean room, powered up and purged with nitrogen, until a launch could be rescheduled. This costly situation (about US$6 million per month) pushed the overall costs of the project higher. However, this delay allowed time for engineers to perform extensive tests, swap out a possibly failure-prone battery, and make other improvements. Furthermore, the ground software needed to control Hubble was not ready in 1986, and was barely ready by the 1990 launch. Following the resumption of shuttle flights, Space Shuttle Discovery successfully launched the Hubble on April 24, 1990, as part of the STS-31 mission.

At launch, NASA had spent approximately US$4.7 billion in inflation-adjusted 2010 dollars on the project. Hubble's cumulative costs are estimated to be about US$11.3 billion in 2015 dollars, which include all subsequent servicing costs, but not ongoing operations, making it the most expensive science mission in NASA history.



List of Hubble instruments

Hubble accommodates five science instruments at a given time, plus the Fine Guidance Sensors, which are mainly used for aiming the telescope but are occasionally used for scientific astrometry measurements. Early instruments were replaced with more advanced ones during the Shuttle servicing missions. COSTAR was a corrective optics device rather than a science instrument, but occupied one of the four axial instrument bays.
Since the final servicing mission in 2009, the four active instruments have been ACS, COS, STIS and WFC3. NICMOS is kept in hibernation, but may be revived if WFC3 were to fail in the future.

.Advanced Camera for Surveys (ACS; 2002–present)

.Cosmic Origins Spectrograph (COS; 2009–present)

.Corrective Optics Space Telescope Axial Replacement (COSTAR; 1993–2009)

.Faint Object Camera (FOC; 1990–2002)

.Faint Object Spectrograph (FOS; 1990–1997)

.Fine Guidance Sensor (FGS; 1990–present)

.Goddard High Resolution Spectrograph (GHRS/HRS; 1990–1997)

.High Speed Photometer (HSP; 1990–1993)

.Near Infrared Camera and Multi-Object Spectrometer (NICMOS; 1997–present, hibernating since 2008)

.Space Telescope Imaging Spectrograph (STIS; 1997–present (non-operative 2004–2009)

.Wide Field and Planetary Camera (WFPC; 1990–1993)

.Wide Field and Planetary Camera 2 (WFPC2; 1993–2009)

.Wide Field Camera 3 (WFC3; 2009–present)

Of the former instruments, three (COSTAR, FOS and WFPC2) are displayed in the Smithsonian National Air and Space Museum. The FOC is in the Dornier museum, Germany. The HSP is in the Space Place at the University of Wisconsin–Madison. The first WFPC was dismantled, and some components were then re-used in WFC3.



Flawed mirror

Within weeks of the launch of the telescope, the returned images indicated a serious problem with the optical system. Although the first images appeared to be sharper than those of ground-based telescopes, Hubble failed to achieve a final sharp focus and the best image quality obtained was drastically lower than expected. Images of point sources spread out over a radius of more than one arcsecond, instead of having a point spread function concentrated within a circle 0.1 arcseconds (485 nrad) in diameter, as had been specified in the design criteria.
Analysis of the flawed images revealed that the primary mirror had been polished to the wrong shape. Although it was believed to be one of the most precisely figured optical mirrors ever made, smooth to about 10 nanometers, the outer perimeter was too flat by about 2200 nanometers (about 1⁄450 mm or 1⁄11000 inch). This difference was catastrophic, introducing severe spherical aberration, a flaw in which light reflecting off the edge of a mirror focuses on a different point from the light reflecting off its center.

The effect of the mirror flaw on scientific observations depended on the particular observation—the core of the aberrated PSF was sharp enough to permit high-resolution observations of bright objects, and spectroscopy of point sources was affected only through a sensitivity loss. However, the loss of light to the large, out-of-focus halo severely reduced the usefulness of the telescope for faint objects or high-contrast imaging. This meant nearly all the cosmological programs were essentially impossible, since they required observation of exceptionally faint objects. This led politicians to question NASA's competence, scientists to rue the cost which could have gone to more productive endeavors, and comedians to make jokes about NASA and the telescope. In the 1991 comedy The Naked Gun 2½: The Smell of Fear, in a scene where historical disasters are displayed, Hubble is pictured with RMS Titanic and LZ 129 Hindenburg. Nonetheless, during the first three years of the Hubble mission, before the optical corrections, the telescope carried out a large number of productive observations of less demanding targets. The error was well characterized and stable, enabling astronomers to partially compensate for the defective mirror by using sophisticated image processingtechniques such as deconvolution.


Origin of the problem

A commission headed by Lew Allen, director of the Jet Propulsion Laboratory, was established to determine how the error could have arisen. The Allen Commission found that a reflective null corrector, a testing device used to achieve a properly shaped non-spherical mirror, had been incorrectly assembled—one lens was out of position by 1.3 mm (0.051 in). During the initial grinding and polishing of the mirror, Perkin-Elmer analyzed its surface with two conventional refractive null correctors. However, for the final manufacturing step, they switched to the custom-built reflective null corrector, designed explicitly to meet very strict tolerances. The incorrect assembly of this device resulted in the mirror being ground very precisely but to the wrong shape. During fabrication, a few tests using conventional null correctors correctly reported spherical aberration. But these results were dismissed, thus missing the opportunity to catch the error, because the reflective null corrector was considered more accurate.

The commission blamed the failings primarily on Perkin-Elmer. Relations between NASA and the optics company had been severely strained during the telescope construction, due to frequent schedule slippage and cost overruns. NASA found that Perkin-Elmer did not review or supervise the mirror construction adequately, did not assign its best optical scientists to the project (as it had for the prototype), and in particular did not involve the optical designers in the construction and verification of the mirror. While the commission heavily criticized Perkin-Elmer for these managerial failings, NASA was also criticized for not picking up on the quality control shortcomings, such as relying totally on test results from a single instrument.


Design of a solution

Many feared that Hubble would be abandoned. The design of the telescope had always incorporated servicing missions, and astronomers immediately began to seek potential solutions to the problem that could be applied at the first servicing mission, scheduled for 1993. While Kodak had ground a back-up mirror for Hubble, it would have been impossible to replace the mirror in orbit, and too expensive and time-consuming to bring the telescope back to Earth for a refit. Instead, the fact that the mirror had been ground so precisely to the wrong shape led to the design of new optical components with exactly the same error but in the opposite sense, to be added to the telescope at the servicing mission, effectively acting as "spectacles" to correct the spherical aberration.

The first step was a precise characterization of the error in the main mirror. Working backwards from images of point sources, astronomers determined that the conic constant of the mirror as built was −1.01390±0.0002, instead of the intended −1.00230. The same number was also derived by analyzing the null corrector used by Perkin-Elmer to figure the mirror, as well as by analyzing interferograms obtained during ground testing of the mirror.

Because of the way the HST's instruments were designed, two different sets of correctors were required. The design of the Wide Field and Planetary Camera 2, already planned to replace the existing WF/PC, included relay mirrors to direct light onto the four separate charge-coupled device chips making up its two cameras. An inverse error built into their surfaces could completely cancel the aberration of the primary. However, the other instruments lacked any intermediate surfaces that could be configured in this way, and so required an external correction device.

The Corrective Optics Space Telescope Axial Replacement (COSTAR) system was designed to correct the spherical aberration for light focused at the FOC, FOS, and GHRS. It consists of two mirrors in the light path with one ground to correct the aberration. To fit the COSTAR system onto the telescope, one of the other instruments had to be removed, and astronomers selected the High Speed Photometer to be sacrificed. By 2002, all the original instruments requiring COSTAR had been replaced by instruments with their own corrective optics. COSTAR was then removed and returned to Earth in 2009 where it is exhibited at the National Air and Space Museum in Washington, D.C. The area previously used by COSTAR is now occupied by the Cosmic Origins Spectrograph.



Servicing missions and new instruments

Servicing overview

Hubble was designed to accommodate regular servicing and equipment upgrades while in orbit. Instruments and limited life items were designed as orbital replacement units. Five servicing missions (SM 1, 2, 3A, 3B, and 4) were flown by NASA Space Shuttles, the first in December 1993 and the last in May 2009. Servicing missions were delicate operations that began with maneuvering to intercept the telescope in orbit and carefully retrieving it with the shuttle's mechanical arm. The necessary work was then carried out in multiple tethered spacewalks over a period of four to five days. After a visual inspection of the telescope, astronauts conducted repairs, replaced failed or degraded components, upgraded equipment, and installed new instruments. Once work was completed, the telescope was redeployed, typically after boosting to a higher orbit to address the orbital decay caused by atmospheric drag.


Servicing Mission 1

The first Hubble servicing mission was scheduled for 1993 before the mirror problem was discovered. It assumed greater importance, as the astronauts would need to do extensive work to install corrective optics; failure would have resulted in either abandoning Hubble or accepting its permanent disability. Other components failed before the mission, causing the repair cost to rise to $500 million (not including the cost of the shuttle flight). A successful repair would help demonstrate the viability of building Space Station Alpha.

STS-49 in 1992 demonstrated the difficulty of space work. While its rescue of Intelsat 603 received praise, the astronauts had taken possibly reckless risks in doing so. Neither the rescue nor the unrelated assembly of prototype space station components occurred as the astronauts had trained, causing NASA to reassess planning and training, including for the Hubble repair. The agency assigned to the mission Story Musgrave—who had worked on satellite repair procedures since 1976—and six other experienced astronauts, including two from STS-49. The first mission director since Project Apollo would coordinate a crew with 16 previous shuttle flights. The astronauts were trained to use about a hundred specialized tools.

Heat had been the problem on prior spacewalks, which occurred in sunlight. Hubble needed to be repaired out of sunlight. Musgrave discovered during vacuum training, seven months before the mission, that spacesuit gloves did not sufficiently protect against the cold of space. After STS-57 confirmed the issue in orbit, NASA quickly changed equipment, procedures, and flight plan. Seven total mission simulations occurred before launch, the most thorough preparation in shuttle history. No complete Hubble mockup existed, so the astronauts studied many separate models (including one at the Smithsonian) and mentally combined their varying and contradictory details.

Service Mission 1 flew aboard Endeavour in December 1993, and involved installation of several instruments and other equipment over ten days. Most importantly, the High Speed Photometer was replaced with the COSTAR corrective optics package, and WF/PC was replaced with the Wide Field and Planetary Camera 2(WFPC2) with an internal optical correction system. The solar arrays and their drive electronics were also replaced, as well as four gyroscopes in the telescope pointing system, two electrical control units and other electrical components, and two magnetometers. The onboard computers were upgraded with added  coprocessors, and Hubble's orbit was boosted.

On January 13, 1994, NASA declared the mission a complete success and showed the first sharper images. The mission was one of the most complex performed to that date, involving five long extra-vehicular activity periods. Its success was a boon for NASA, as well as for the astronomers who now had a more capable space telescope.


Servicing Mission 2

Servicing Mission 2, flown by Discovery in February 1997, replaced the GHRS and the FOS with the Space Telescope Imaging Spectrograph and the Near Infrared Camera and Multi-Object Spectrometer(NICMOS), replaced an Engineering and Science Tape Recorder with a new Solid State Recorder, and repaired thermal insulation. NICMOS contained a heat sink of solid nitrogen to reduce the thermal noise from the instrument, but shortly after it was installed, an unexpected thermal expansion resulted in part of the heat sink coming into contact with an optical baffle. This led to an increased warming rate for the instrument and reduced its original expected lifetime of 4.5 years to about two years.


Servicing Mission 3A

Servicing Mission 3A, flown by Discovery, took place in December 1999, and was a split-off from Servicing Mission3 after three of the six onboard gyroscopes had failed. The fourth failed a few weeks before the mission, rendering the telescope incapable of performing scientific observations. The mission replaced all six gyroscopes, replaced a Fine Guidance Sensor and the computer, installed a Voltage/temperature Improvement Kit to prevent battery overcharging, and replaced thermal insulation blankets.


Servicing Mission 3B

Servicing Mission 3B flown by Columbia in March 2002 saw the installation of a new instrument, with the FOC being replaced by the Advanced Camera for Surveys. This meant COSTAR was no longer required, since all new instruments had built-in correction for the main mirror aberration. The mission also revived NICMOS by installing a closed-cycle cooler and replaced the solar arrays for the second time, providing 30 percent more power.


Servicing Mission 4

Plans called for Hubble to be serviced in February 2005, but the Columbia disaster in 2003, in which the orbiter disintegrated on re-entry into the atmosphere, had wide-ranging effects to the Hubble program and other NASA missions. NASA Administrator Sean O'Keefedecided all future shuttle missions had to be able to reach the safe haven of the International Space Station should in-flight problems develop. As no shuttles were capable of reaching both HST and the space station during the same mission, future crewed service missions were canceled. This decision was criticised by numerous astronomers who felt Hubble was valuable enough to merit the human risk. HST's planned successor, the James Webb Space Telescope, by 2004 was not expected to launch until at least 2011. JWST was eventually launched in December 2021. A gap in space-observing capabilities between a decommissioning of Hubble and the commissioning of a successor was of major concern to many astronomers, given the significant scientific impact of HST. The consideration that JWST will not be located in low Earth orbit, and therefore cannot be easily upgraded or repaired in the event of an early failure, only made concerns more acute. On the other hand, NASA officials were concerned that continuing to service Hubble would consume funds from other programs and delay the JWST.

In January 2004, O'Keefe said he would review his decision to cancel the final servicing mission to HST, due to public outcry and requests from Congress for NASA to look for a way to save it. The National Academy of Sciences convened an official panel, which recommended in July 2004 that the HST should be preserved despite the apparent risks. Their report urged "NASA should take no actions that would preclude a space shuttle servicing mission to the Hubble Space Telescope". In August 2004, O'Keefe asked Goddard Space Flight Center to prepare a detailed proposal for a robotic service mission. These plans were later canceled, the robotic mission being described as "not feasible". In late 2004, several Congressional members, led by Senator Barbara Mikulski, held public hearings and carried on a fight with much public support (including thousands of letters from school children across the US.) to get the Bush Administration and NASA to reconsider the decision to drop plans for a Hubble rescue mission.

The nomination in April 2005 of a new NASA Administrator, Michael D. Griffin, changed the situation, as Griffin stated he would consider a crewed servicing mission. Soon after his appointment Griffin authorized Goddard to proceed with preparations for a crewed Hubble maintenance flight, saying he would make the final decision after the next two shuttle missions. In October 2006 Griffin gave the final go-ahead, and the 11-day mission by Atlantis was scheduled for October 2008. Hubble's main data-handling unit failed in September 2008, halting all reporting of scientific data until its back-up was brought online on October 25, 2008. Since a failure of the backup unit would leave the HST helpless, the service mission was postponed to incorporate a replacement for the primary unit.

Servicing Mission 4 (SM4), flown by Atlantis in May 2009, was the last scheduled shuttle mission for HST. SM4 installed the replacement data-handling unit, repaired the ACS and STIS systems, installed improved nickel hydrogen batteries, and replaced other components including all six gyroscopes. SM4 also installed two new observation instruments—Wide Field Camera 3 and the Cosmic Origins Spectrograph and the Soft Capture and Rendezvous System, which will enable the future rendezvous, capture, and safe disposal of Hubble by either a crewed or robotic mission. Except for the ACS's High Resolution Channel, which could not be repaired and was disabled, the work accomplished during SM4 rendered the telescope fully functional.



Public use

Proposal process

Anyone can apply for time on the telescope; there are no restrictions on nationality or academic affiliation, but funding for analysis is available only to U.S. institutions. Competition for time on the telescope is intense, with about one-fifth of the proposals submitted in each cycle earning time on the schedule.

Calls for proposals are issued roughly annually, with time allocated for a cycle lasting about one year. Proposals are divided into several categories; "general observer" proposals are the most common, covering routine observations. "Snapshot observations" are those in which targets require only 45 minutes or less of telescope time, including overheads such as acquiring the target. Snapshot observations are used to fill in gaps in the telescope schedule that cannot be filled by regular general observer programs.

Astronomers may make "Target of Opportunity" proposals, in which observations are scheduled if a transient event covered by the proposal occurs during the scheduling cycle. In addition, up to 10% of the telescope time is designated "director's discretionary" (DD) time. Astronomers can apply to use DD time at any time of year, and it is typically awarded for study of unexpected transient phenomena such as supernovae.

Other uses of DD time have included the observations that led to views of the Hubble Deep Field and Hubble Ultra Deep Field, and in the first four cycles of telescope time, observations that were carried out by amateur astronomers.

In 2012, the ESA held a contest for public image processing of Hubble data to encourage the discovery of "hidden treasures" in the raw Hubble data.


Use by amateur astronomers

The first director of STScI, Riccardo Giacconi, announced in 1986 that he intended to devote some of his director discretionary time to allowing amateur astronomers to use the telescope. The total time to be allocated was only a few hours per cycle but excited great interest among amateur astronomers.

Proposals for amateur time were stringently reviewed by a committee of amateur astronomers, and time was awarded only to proposals that were deemed to have genuine scientific merit, did not duplicate proposals made by professionals, and required the unique capabilities of the space telescope. Thirteen amateur astronomers were awarded time on the telescope, with observations being carried out between 1990 and 1997. One such study was "Transition Comets—UV Search for OH". The first proposal, "A Hubble Space Telescope Study of Posteclipse Brightening and Albedo Changes on Io", was published in Icarus, a journal devoted to solar system studies. A second study from another group of amateurs was also published in Icarus. After that time, however, budget reductions at STScI made the support of work by amateur astronomers untenable, and no additional amateur programs have been carried out.

Regular Hubble proposals still include findings or discovered objects by amateurs and citizen scientists. These observations are often in a collaboration with professional astronomers. One of the earliest such observations is the Great White Spot of 1990 on planet Saturn, discovered by amateur astronomer S. Wilber and observed by HST under a proposal by J. Westphal. Later professional-amateur observations by Hubble include discoveries by the Galaxy Zoo project, such as Voorwerpjes and Green Pea galaxies. The "Gems of the Galaxies" program is based on a list of objects by Galaxy Zoo volunteers that was shortened with the help of an online vote. Additionally there are observations of minor planets discovered by amateur astronomers, such as 2I/Borisov and changes in the atmosphere of the gas giants Jupiter and Saturn or the ice giants Uranus and Neptune. In the pro-am collaboration backyard worlds the HST was used to observe a planetary mass object, called WISE J0830+2837. The non-detection by the HST helped to classify this peculiar object.



Hubble data

Transmission to Earth

Hubble data was initially stored on the spacecraft. When launched, the storage facilities were old-fashioned reel-to-reel tape drives, but these were replaced by solid state data storage facilities during servicing missions2 and 3A. About twice daily, the Hubble Space Telescope radios data to a satellite in the geosynchronous Tracking and Data Relay Satellite System (TDRSS), which then downlinks the science data to one of two 60-foot (18-meter) diameter high-gain microwave antennas located at the White Sands Test Facility in White Sands, New Mexico. From there they are sent to the Space Telescope Operations Control Center at Goddard Space Flight Center, and finally to the Space Telescope Science Institute for archiving. Each week, HST downlinks approximately 140 gigabits of data.


Color images

All images from Hubble are monochromatic grayscale, taken through a variety of filters, each passing specific wavelengths of light, and incorporated in each camera. Color images are created by combining separate monochrome images taken through different filters. This process can also create false-colorversion of images including infrared and ultraviolet channels, where infrared is typically rendered as a deep red and ultraviolet is rendered as a deep blue.
Archives

All Hubble data is eventually made available via the Mikulski Archive for Space Telescopes at STScl, CADC and ESA/ESAC. Data is usually proprietary—available only to the principal investigator (PI) and astronomers designated by the PI—for twelve months after being taken. The PI can apply to the director of the STScI to extend or reduce the proprietary period in some circumstances.

Observations made on Director's Discretionary Time are exempt from the proprietary period, and are released to the public immediately. Calibration data such as flat fields and dark frames are also publicly available straight away. All data in the archive is in the FITS format, which is suitable for astronomical analysis but not for public use. The Hubble Heritage Project processes and releases to the public a small selection of the most striking images in JPEG and TIFF formats.


Pipeline reduction

Astronomical data taken with CCDs must undergo several calibration steps before they are suitable for astronomical analysis. STScI has developed sophisticated software that automatically calibrates data when they are requested from the archive using the best calibration files available. This 'on-the-fly' processing means large data requests can take a day or more to be processed and returned. The process by which data is calibrated automatically is known as 'pipeline reduction', and is increasingly common at major observatories. Astronomers may if they wish retrieve the calibration files themselves and run the pipeline reduction software locally. This may be desirable when calibration files other than those selected automatically need to be used.


Data analysis

Hubble data can be analyzed using many different packages. STScI maintains the custom-made Space Telescope Science Data Analysis System (STSDAS) software, which contains all the programs needed to run pipeline reduction on raw data files, as well as many other astronomical image processing tools, tailored to the requirements of Hubble data. The software runs as a module of IRAF, a popular astronomical data reduction program.



Outreach activities

NASA considered it important for the Space Telescope to capture the public's imagination, given the considerable contribution of taxpayers to its construction and operational costs. After the difficult early years when the faulty mirror severely dented Hubble's reputation with the public, the first servicing mission allowed its rehabilitation as the corrected optics produced numerous remarkable images.

Several initiatives have helped to keep the public informed about Hubble activities. In the United States, outreach efforts are coordinated by the Space Telescope Science Institute (STScI) Office for Public Outreach, which was established in 2000 to ensure that U.S. taxpayers saw the benefits of their investment in the space telescope program. To that end, STScI operates the HubbleSite.org website. The Hubble Heritage Project, operating out of the STScI, provides the public with high-quality images of the most interesting and striking objects observed. The Heritage team is composed of amateur and professional astronomers, as well as people with backgrounds outside astronomy, and emphasizes the aesthetic nature of Hubble images. The Heritage Project is granted a small amount of time to observe objects which, for scientific reasons, may not have images taken at enough wavelengths to construct a full-color image.

Since 1999, the leading Hubble outreach group in Europe has been the Hubble European Space Agency Information Centre (HEIC). This office was established at the Space Telescope European Coordinating Facility in Munich, Germany. HEIC's mission is to fulfill HST outreach and education tasks for the European Space Agency. The work is centered on the production of news and photo releases that highlight interesting Hubble results and images. These are often European in origin, and so increase awareness of both ESA's Hubble share (15%) and the contribution of European scientists to the observatory. ESA produces educational material, including a videocast series called Hubblecast designed to share world-class scientific news with the public.

The Hubble Space Telescope has won two Space Achievement Awards from the Space Foundation, for its outreach activities, in 2001 and 2010.

A replica of the Hubble Space Telescope is displayed on the courthouse lawn in Marshfield, Missouri, the hometown of namesake Edwin P. Hubble.


Celebration images

The Hubble Space Telescope celebrated its 20th anniversary in space on April 24, 2010. To commemorate the occasion, NASA, ESA, and the Space Telescope Science Institute (STScI) released an image from the Carina Nebula.

To commemorate Hubble's 25th anniversary in space on April 24, 2015, STScI released images of the Westerlund 2 cluster, located about 20,000 light-years away in the constellation Carina, through its Hubble 25 website. The European Space Agency created a dedicated 25th anniversary page on its website. In April 2016, a special celebratory image of the Bubble Nebula was released for Hubble's 26th "birthday".



Equipment failures

Gyroscope rotation sensors

HST uses gyroscopes to detect and measure any rotations so it can stabilize itself in orbit and point accurately and steadily at astronomical targets. Three gyroscopes are normally required for operation; observations are still possible with two or one, but the area of sky that can be viewed would be somewhat restricted, and observations requiring very accurate pointing are more difficult. In 2018, the plan was to drop into one-gyroscope mode if fewer than three working gyroscopes were operational. The gyroscopes are part of the Pointing Control System, which uses five types of sensors (magnetic sensors, optical sensors, and the gyroscopes) and two types of actuators(reaction wheels and magnetic torquers).

After the Columbia disaster in 2003, it was unclear whether another servicing mission would be possible, and gyroscope life became a concern again, so engineers developed new software for two-gyroscope and one-gyroscope modes to maximize the potential lifetime. The development was successful, and in 2005, it was decided to switch to two-gyroscope mode for regular telescope operations as a means of extending the lifetime of the mission. The switch to this mode was made in August 2005, leaving Hubble with two gyroscopes in use, two on backup, and two inoperable. One more gyroscope failed in 2007.

By the time of the final repair mission in May 2009, during which all six gyroscopes were replaced (with two new pairs and one refurbished pair), only three were still working. Engineers determined that the gyroscope failures were caused by corrosion of electric wires powering the motor that was initiated by oxygen-pressurized air used to deliver the thick suspending fluid. The new gyroscope models were assembled using pressurized nitrogen and were expected to be much more reliable. In the 2009 servicing mission all six gyroscopes were replaced, and after almost ten years only three gyroscopes failed, and only after exceeding the average expected run time for the design.

Of the six gyroscopes replaced in 2009, three were of the old design susceptible for flex-lead failure, and three were of the new design with a longer expected lifetime. The first of the old-style gyroscopes failed in March 2014, and the second in April 2018. On October 5, 2018, the last of the old-style gyroscopes failed, and one of the new-style gyroscopes was powered-up from standby state. However, that reserve gyroscope did not immediately perform within operational limits, and so the observatory was placed into "safe" mode while scientists attempted to fix the problem. NASA tweeted on October 22, 2018, that the "rotation rates produced by the backup gyro have reduced and are now within a normal range. Additional tests [are] to be performed to ensure Hubble can return to science operations with this gyro."

The solution that restored the backup new-style gyroscope to operational range was widely reported as "turning it off and on again". A "running restart" of the gyroscope was performed, but this had no effect, and the final resolution to the failure was more complex. The failure was attributed to an inconsistency in the fluid surrounding the float within the gyroscope (e.g., an air bubble). On October 18, 2018, the Hubble Operations Team directed the spacecraft into a series of maneuvers—moving the spacecraft in opposite directions—in order to mitigate the inconsistency. Only after the maneuvers, and a subsequent set of maneuvers on October 19, did the gyroscope truly operate within its normal range.


Instruments and electronics

Past servicing missions have exchanged old instruments for new ones, avoiding failure and making new types of science possible. Without servicing missions, all the instruments will eventually fail. In August 2004, the power system of the Space Telescope Imaging Spectrograph failed, rendering the instrument inoperable. The electronics had originally been fully redundant, but the first set of electronics failed in May 2001. This power supply was fixed during Servicing Mission4 in May 2009. Similarly, the Advanced Camera for Surveys main camera primary electronics failed in June 2006, and the power supply for the backup electronics failed on January 27, 2007. Only the instrument's Solar Blind Channel was operable using the side-1 electronics. A new power supply for the wide angle channel was added during SM 4, but quick tests revealed this did not help the high resolution channel. The Wide Field Channel was returned to service by STS-125 in May 2009 but the High Resolution Channel remains offline.
On January 8, 2019, Hubble entered a partial safe mode following suspected hardware problems in its most advanced instrument, the Wide Field Camera 3 instrument. NASA later reported that the cause of the safe mode within the instrument was a detection of voltage levels out of a defined range. On January 15, 2019, NASA said the cause of the failure was a software problem. Engineering data within the telemetry circuits were not accurate. In addition, all other telemetry within those circuits also contained erroneous values indicating that this was a telemetry issue and not a power supply issue. After resetting the telemetry circuits and associated boards the instrument began functioning again. On January 17, 2019, the device was returned to normal operation and on the same day it completed its first science observations.


2021 power control issue

On June 13, 2021, Hubble's payload computer halted due to a suspected issue with a memory module. An attempt to restart the computer on June 14 failed. Further attempts to switch to one of three other backup memory modules on board the spacecraft failed on June 18. On June 23 and 24, NASA engineers switched Hubble to a backup payload computer, but these operations have failed as well with the same error. On June 28, 2021, NASA announced that it was extending the investigation to other components. Scientific operations were suspended while NASA worked to diagnose and resolve the issue. After identifying a malfunctioning power control unit (PCU) supplying power to one of Hubble's computers, NASA was able to switch to a backup PCU and bring Hubble back to operational mode on July 16. On October 23, 2021, HST instruments reported missing synchronization messages and went into safe mode. By December 8, 2021, NASA had restored full science operations and was developing updates to make instruments more resilient to missing synchronization messages.



Future

Orbital decay and controlled reentry

Hubble orbits the Earth in the extremely tenuous upper atmosphere, and over time its orbit decays due to drag. If not reboosted, it will re-enter the Earth's atmosphere within some decades, with the exact date depending on how active the Sun is and its impact on the upper atmosphere. If Hubble were to descend in a completely uncontrolled re-entry, parts of the main mirror and its support structure would probably survive, leaving the potential for damage or even human fatalities. In 2013, deputy project manager James Jeletic projected that Hubble could survive into the 2020s. In November 2021, NASA extended the service contract for Hubble until June 2026.

Related content
Comments: 1

EpicMytic [2024-04-27 20:57:57 +0000 UTC]

👍: 1 ⏩: 0